MOCs and MFRs

2023 North Santiam Basin Coordination Forms

23DET01 MFR Commercial Power Loss

23BCL01 MFR Circuit Breaker XJ31 ground fault

2021 North Santiam Basin Coordination Forms

21DET01 Detroit Dam IRRM Temporary Pool Restrictions
21DET02 MFR Detroit Water temperature and Fish Passage Measure 07
21DET03 Minto Fish Facility-AWS Screen Air Burst System

21BCL01 MFR Forced Turbine Outage
21BCL02 MFR Spill Gate Malfunction
21DET03 Minto Fish Facility-AWS Screen Air Burst System

2020 North Santiam Basin Coordination Forms

20DET01 MFR Marion Forks Hatchery Pipe-Valve Leaks
20DET02 MFR Elevated TDG
20DET04 MFR Detroit Reservoir Levels (Wildfires)
20DET05 Downstream Fish Passage Operation DRAFT

20BCL01 MFR Elevated TDG high flows
20BCL02 North Santiam Flows
20BCL03 MFR Turbine Unit Forced Outage
20BCL05 MFR Spill Gate Misoperation

2019 North Santiam Basin Coordination Forms
19DET01 MFR Rehabilitation of Spillway Gates

19BCL01 MFR Spawning Flows in North Santiam River
19BCL01 and 19FOS04 Attachment 1 MFR Spawning Flows response
19BCL02 MFR Elevated TDG unit outage high flows
19BCL02 MFR Attachment 1 Elevated TDG unit outage high flows ODFW comments
19BCL03 MFR Turbine Unit Forced Outage
19BCL03 Attachment 1 NMFScomments_19BCL03 MFR Forced Outage

2018 North Santiam Basin Coordination Forms

18DET01 MFR Temperature Operations Delay Due to Algal Bloom Update 1
18DET01 Attachment 1 NMFS comments 18DET01 Temperature Operations Delay due to Algal Bloom
18DET01 Attachment 2 NMFS comments UPDATE to 18DET01 Temperature Operations Delay due to Algal Bloom
18DET02 North Santiam Water Temperature Targets

18BCL01 Turbine Testing
18BLC01 Attachment 1 NMFS comments 18BLC01 Turbine Testing
18BCL02 North Santiam Flows
18BCL02 Attachment 1 18BCL02 March alternatives
18BCL03 MFR minimum flow
18BCL04 debris removal operation
18BCL05 MFR turbine unit outage
18BCL06 MFR turbine unit outage
18BCL07 MFR turbine unit outage

2017 North Santiam Basin Coordination Forms

17DET04 MFR Minto Fish Facility Hoist Failure
17DET03 MFR temperature decrease
17DET03 Attachment 1 NMFS comments 17DET03 MFR temperature decrease
17DET02 North Santiam Temperature Targets
17DET02 Attachment 1 Proposed changes to the Thermal Regime in the North Santiam Subbasin
17DET02 Attachment 2 ODFW_proposed_target_evaluation
17DET02 Attachment 3 NS ChS StW Eval Criteria
17DET02 Attachment 4 NS Temp Targets 10262016
17DET02 Attachment 5 NMFS comments 17DET02 N Santiam temp targets_4_19_2017
17DET01 Minto Ladder Outage
17DET01 Attachment 1 NMFS comments MOC minto ladder outage

17BCL07 Remedial Investigation, Spill, and TDG
17BCL07 Attachment 1 NMFS comments 17BCL07 Remedial Investigation Spill TDG
17BCL06 MFR minimum flow ramp rate
17BCL06 NMFS Attachment 1 comments 17BCL06 minimum flow ramp rate
17BCL05 MFR Big Cliff ramp rate
17BCL05 Attachment 1 NMFS comments 17BCL05 Ramp Rate.final
17BCL04 turbine unit outage
17BCL04 NMFS comments 17BCL04 MFR turbine unit outage
17BCL03 MFR minimum flow
17BCL03 Attachment 1 NMFS comments 17BCL03 MFR minimum flow
17BCL02 MFR turbine unit forced outage
17BCL02 Attachment 1 NMFS comments 17BCL02 MFR turbine unit outage_20170118
17BCL01 MFR turbine unit outage
17BCL01 Attachment 1 NMFS comments 17BCL01 MFR turbine unit outage

2016 North Santiam Basin Coordination Forms

16DET06 MFR Minto Fish Facility Power Issues
16DET05 MFR Minto Fish Facility Mortalities
16DET04 MFR Minto Fish Facility Power Outage
16DET03 Ladder Outage
16DET02 Ladder Outage
16DET01 Minto Ladder Outage

16BCL03 MFR turbine unit outage
16BCL03 Attachment 1 NMFS comments 16BCL03 MFR turbine unit outage
16BCL02 MFR minimum flow
16BCL01 MFR minimum flow

2015 North Santiam Basin Coordination Forms

15DET02 Lower RO Test
15DET01 MFR 2015 NOR Chinook outplanting decision final